Largest offshore wind power project in GBA fully operational

Time:2023-12-14 11:24:46      Source:Xinhuanet.com

The largest offshore wind power project in the Guangdong-Hong Kong-Macao Greater Bay Area, with an annual electricity generation capacity of 3 billion kWh, is now fully operational, according to the China General Nuclear Power Corporation (CGN).

The first phase of the project in Huizhou, south China's Guangdong Province, with an installed capacity of 250,000 kW, was connected to the grid for power generation in December 2021 after a year of construction. Construction of the second phase, with an installed capacity of 750,000 kW, began in March 2023.

According to Gao Ligang, general manager of CGN, the electricity generated by the wind farm every year is equivalent to reducing standard coal consumption by about 1 million tonnes and carbon dioxide emissions by about 2.35 million tonnes, which will help boost the area's economic and social development and achieve China's dual carbon goals.

Index RMB/t DoD Basis Date
Datong 5500 455 0 ex-mine 07-01
Shuozhou 5200 445 0 FOR 07-01
Ordos 5500 420 0 ex-mine 07-01
Yulin 6200 540 0 ex-mine 07-01
Liulin Low-sulphur 565 0 ex-mine 07-01
Gujiao Low-sulphur 1095 0 FOR 07-01
Xingtai Low-sulphur 1210 0 ex-Factory 07-01
Yangquan PCI 795 0 FOR 07-01
Index RMB/t WoW WoW% Date
中国煤炭市场��?