Sichuan coal base begins storage for energy supply

Time:2022-08-30 14:48:11      Source:ChinaDaily.com
Sichuan province's first national-level large-scale coal reservation base recently started storing coal to help ensure the supply of the fossil fuel and guarantee energy security for the province according to Sichuan Coal Industry Group, one of the project's developers.
 
The move came after rising temperatures made power demand soar and dried up reservoirs used to generate electricity in Sichuan and Chongqing.
 
Gaoxing Coal Reservation Base covers an area of 224 mu (14.9 hectares), and officially started construction on March 10 last year. It has a designed coal storage capacity of 600,000 metric tons and an annual throughput of 6 million tons.
 
After being put into use, the reservation base is expected to see revenue of 2 billion yuan ($292 million) within 2 years, according to the Sichuan Coal Industry Group.
Index RMB/t DoD Basis Date
Datong 5500 450 0 ex-mine 06-13
Shuozhou 5200 435 0 FOR 06-13
Ordos 5500 415 0 ex-mine 06-13
Yulin 6200 535 0 ex-mine 06-13
Liulin Low-sulphur 570 0 ex-mine 06-13
Gujiao Low-sulphur 1095 0 FOR 06-13
Xingtai Low-sulphur 1210 0 ex-Factory 06-13
Yangquan PCI 770 0 FOR 06-13
Index RMB/t WoW WoW% Date
Qinhuangdao 620.0 -38.0 -5.78 06-12
Caofeidian 528.0 -39.0 -6.88 06-12
Huanghua 178.3 -12.0 -6.31 06-12
Guangzhou 290.0 13.0 4.69 06-12
coastal 6PPs 1629.8 44.7 2.82 07-02
North Ports 2697.8 53.0 2.00 02-01
Yangtze River delta 1242.5 -74.7 -5.67 02-01
South Ports 2233.4 -216.0 -8.82 02-01
中国煤炭市场��?