Chinese nuclear power operator launches offshore wind farm

Time:2022-01-06 18:08:39      Source:Xinhuanet.com
China General Nuclear Power Corporation (CGN) said on Thursday that it has put an offshore wind farm into full operation off the coast of east China's Fujian Province.
 
The wind-power project, in the sea waters northeast of Dalian Island in Pingtan County, was connected to the power grid at full capacity on Wednesday night, said the Shenzhen-headquartered company.
 
The project, with 60 turbines, has a total installed power generation capacity of 240 MW.
 
It is expected to send about 960 million kWh of electricity to the power grid annually, saving 308,100 tonnes of standard coal and reducing carbon dioxide emissions by 900,000 tonnes a year.
 
CGN is China's largest nuclear power operator, and has invested heavily in offshore wind power over the years, building 2,358 MW of offshore wind-power projects in the country thus far.
Index RMB/t DoD Basis Date
Datong 5500 450 0 ex-mine 06-16
Shuozhou 5200 435 0 FOR 06-16
Ordos 5500 415 0 ex-mine 06-16
Yulin 6200 535 0 ex-mine 06-16
Liulin Low-sulphur 560 -10 ex-mine 06-16
Gujiao Low-sulphur 1095 0 FOR 06-16
Xingtai Low-sulphur 1210 0 ex-Factory 06-16
Yangquan PCI 770 0 FOR 06-16
Index RMB/t WoW WoW% Date
Qinhuangdao 620.0 -38.0 -5.78 06-12
Caofeidian 528.0 -39.0 -6.88 06-12
Huanghua 178.3 -12.0 -6.31 06-12
Guangzhou 290.0 13.0 4.69 06-12
coastal 6PPs 1629.8 44.7 2.82 07-02
North Ports 2697.8 53.0 2.00 02-01
Yangtze River delta 1242.5 -74.7 -5.67 02-01
South Ports 2233.4 -216.0 -8.82 02-01
中国煤炭市场��?