Ultra-high altitude wind farm begins operation in Tibet

Time:2021-12-28 16:27:53      Source:Xinhuanet.com
The first batch of wind turbine generators of an ultra-high altitude wind farm in southwest China's Tibet Autonomous Region started to generate electricity and was connected to the power grid on Wednesday.
 
Standing at an altitude of more than 4,850 meters in Trigu Township, Comai County, the wind farm was financed by China Three Gorges Corporation and designed and built by POWERCHINA Chengdu Engineering Corporation Limited.
 
The installation of the facilities started in May and was completed in October. The wind farm has a total installed capacity of 22 megawatts.
 
The wind farm is an ultra-high altitude wind power research demonstration project, which is expected to drive local economic and social development, improve the local energy structure, as well as promote the local tourism industry. 
Index RMB/t DoD Basis Date
Datong 5500 700 0 ex-mine 05-04
Shuozhou 5200 680 0 FOR 05-04
Ordos 5500 700 0 ex-mine 05-04
Yulin 6200 780 0 ex-mine 05-04
Liulin Low-sulphur 900 0 ex-mine 05-04
Gujiao Low-sulphur 1770 -50 FOR 05-04
Xingtai Low-sulphur 2360 0 ex-Factory 05-04
Yangquan PCI 1280 -30 FOR 05-04
Index RMB/t WoW WoW% Date
Qinhuangdao 507.0 1.0 0.20 05-04
Caofeidian 541.0 9.0 1.69 05-04
Huanghua 216.9 12.4 6.06 05-04
Guangzhou 291.2 3.0 1.04 04-27
coastal 6PPs 1629.8 44.7 2.82 07-02
North Ports 2697.8 53.0 2.00 02-01
Yangtze River delta 1242.5 -74.7 -5.67 02-01
South Ports 2233.4 -216.0 -8.82 02-01
中国煤炭市场��?