Ultra-high altitude wind farm begins operation in Tibet

Time:2021-12-28 16:27:53      Source:Xinhuanet.com
The first batch of wind turbine generators of an ultra-high altitude wind farm in southwest China's Tibet Autonomous Region started to generate electricity and was connected to the power grid on Wednesday.
 
Standing at an altitude of more than 4,850 meters in Trigu Township, Comai County, the wind farm was financed by China Three Gorges Corporation and designed and built by POWERCHINA Chengdu Engineering Corporation Limited.
 
The installation of the facilities started in May and was completed in October. The wind farm has a total installed capacity of 22 megawatts.
 
The wind farm is an ultra-high altitude wind power research demonstration project, which is expected to drive local economic and social development, improve the local energy structure, as well as promote the local tourism industry. 
Index RMB/t DoD Basis Date
Datong 5500 450 0 ex-mine 06-16
Shuozhou 5200 435 0 FOR 06-16
Ordos 5500 415 0 ex-mine 06-16
Yulin 6200 535 0 ex-mine 06-16
Liulin Low-sulphur 560 -10 ex-mine 06-16
Gujiao Low-sulphur 1095 0 FOR 06-16
Xingtai Low-sulphur 1210 0 ex-Factory 06-16
Yangquan PCI 770 0 FOR 06-16
Index RMB/t WoW WoW% Date
Qinhuangdao 620.0 -38.0 -5.78 06-12
Caofeidian 528.0 -39.0 -6.88 06-12
Huanghua 178.3 -12.0 -6.31 06-12
Guangzhou 290.0 13.0 4.69 06-12
coastal 6PPs 1629.8 44.7 2.82 07-02
North Ports 2697.8 53.0 2.00 02-01
Yangtze River delta 1242.5 -74.7 -5.67 02-01
South Ports 2233.4 -216.0 -8.82 02-01
中国煤炭市场��?