Work on China's longest coalbed methane pipeline completed

Time:2021-10-21 17:40:06      Source:Chinadaily.com.cn
The construction of the country's longest coalbed methane pipeline finished construction on Wednesday, coming one step closer to the operation of the pipeline, which is under the trunk channel of the South-to-North Water Diversion Project, said its operator China United Coalbed Methane Corp.
 
The major part of the 623-kilometer Shenmu-Anping coalbed methane pipeline, the Shanxi-Hebei section, will be completed and put into operation this year, and about 200 million cubic meters of natural gas can be supplied to North China this winter, said China United Coalbed Methane Corp, a subsidiary of China National Offshore Oil Corp.
 
The operation of the pipeline will help ensure the country's gas supply during the upcoming heating season, said Hu Senlin, director of China United Coalbed Methane Corp.
 
The gas pipeline that connects Shenmu city in Shaanxi province and Anping county in Hebei province is designed to transport 5 billion cubic meters of gas each year.
 
The cross-region pipeline aims to help boost the development of coalbed methane, a form of natural gas extracted from coal beds.
 
 
 
Index RMB/t DoD Basis Date
Datong 5500 700 0 ex-mine 05-04
Shuozhou 5200 680 0 FOR 05-04
Ordos 5500 700 0 ex-mine 05-04
Yulin 6200 780 0 ex-mine 05-04
Liulin Low-sulphur 900 0 ex-mine 05-04
Gujiao Low-sulphur 1770 -50 FOR 05-04
Xingtai Low-sulphur 2360 0 ex-Factory 05-04
Yangquan PCI 1280 -30 FOR 05-04
Index RMB/t WoW WoW% Date
Qinhuangdao 507.0 1.0 0.20 05-04
Caofeidian 541.0 9.0 1.69 05-04
Huanghua 216.9 12.4 6.06 05-04
Guangzhou 291.2 3.0 1.04 04-27
coastal 6PPs 1629.8 44.7 2.82 07-02
North Ports 2697.8 53.0 2.00 02-01
Yangtze River delta 1242.5 -74.7 -5.67 02-01
South Ports 2233.4 -216.0 -8.82 02-01
中国煤炭市场��?