China's first 500 kW wave energy converter delivered

Time:2020-07-02 11:05:44      Source:Xinhuanet.com
China's first 500 kW wave energy converter was delivered to Guangzhou Institute of Energy Conversion, Chinese Academy of Sciences (CAS) Tuesday.
 
Named "Sharp Eagle - Zhoushan," the converter is part of a wave energy demonstration project set up by the Ministry of Natural Resources, which will be located near Dawanshan Island, Zhuhai City, Guangdong Province.
 
Developed by the institute and built by China Merchants Heavy Industry (Shenzhen) Co., Ltd., the device is currently the largest wave energy converter in China.
 
Guangzhou Institute of Energy Conversion, CAS, said they would work with related companies to develop wave energy conversion technology and facilities further.
Index RMB/t DoD Basis Date
Datong 5500 700 0 ex-mine 05-04
Shuozhou 5200 680 0 FOR 05-04
Ordos 5500 700 0 ex-mine 05-04
Yulin 6200 780 0 ex-mine 05-04
Liulin Low-sulphur 900 0 ex-mine 05-04
Gujiao Low-sulphur 1770 -50 FOR 05-04
Xingtai Low-sulphur 2360 0 ex-Factory 05-04
Yangquan PCI 1280 -30 FOR 05-04
Index RMB/t WoW WoW% Date
Qinhuangdao 507.0 1.0 0.20 05-04
Caofeidian 541.0 9.0 1.69 05-04
Huanghua 216.9 12.4 6.06 05-04
Guangzhou 291.2 3.0 1.04 04-27
coastal 6PPs 1629.8 44.7 2.82 07-02
North Ports 2697.8 53.0 2.00 02-01
Yangtze River delta 1242.5 -74.7 -5.67 02-01
South Ports 2233.4 -216.0 -8.82 02-01
中国煤炭市场��?