Newly added coal mines with impact ground pressure are required to reduce

Time:2019-05-08 13:48:16      Source: cctdcoal.com
According to National Development and Reform Commission, the National Development and Reform Commission, Ministry of Emergency Management and other two departments recently issued the Notice on Strengthening the Source Management of Coal Mines with Impact Ground Pressure (hereinafter referred to as the "Notice"). The Notice required that the department in charge of energy should strictly control the gates of coal mine construction, minimize the newly added coal mines with impact ground pressure, classify and dispose stock coal mines with impact ground pressure, and accelerate the elimination and withdrawal of outdated production capacity.
Index RMB/t DoD Basis Date
Datong 5500 ex-mine 07-01
Shuozhou 5200 FOR 07-01
Ordos 5500 ex-mine 07-01
Yulin 6200 ex-mine 07-01
Liulin Low-sulphur ex-mine 07-01
Gujiao Low-sulphur FOR 07-01
Xingtai Low-sulphur ex-Factory 07-01
Yangquan PCI FOR 07-01
Index RMB/t WoW WoW% Date
中国煤炭市场��?