Guizhou's demand for thermal coal will reach 74.6 million tons in 2019

Time:2019-05-07 13:53:55      Source: cctdcoal.com
Hu Shiyan, Deputy Director of the Guizhou Energy Administration recently said it was estimated that the unified power generation will need to reach 173 billion kWh to meet the economic and social development needs of the province in 2019. The demand for thermal coal will reach 74.6 million tons, up about 5 million tons year on year. The pressure on thermal coal supply guarantee is still large, and it is necessary to accelerate the cultivation and the release of advanced coal production capacity.
 
Guizhou Province accelerated the cultivation and the release of advanced coal production capacity and promoted the balanced production of coal in 2018, supplying 63 million tons of coal in the province, up 7.95 million tons year on year. Several years of winter thermal coal tension has been greatly relieved.
 
Guizhou Province should speed up the implementation of the basic energy industry revitalization action in 2019, accelerating the transformation and upgrading of the coal industry, and building a 100 billion-level basic energy industry. While doing a big "quantity", Guizhou Province will pay more attention to the improvement of "quality".
Index RMB/t DoD Basis Date
Datong 5500 700 0 ex-mine 05-04
Shuozhou 5200 680 0 FOR 05-04
Ordos 5500 700 0 ex-mine 05-04
Yulin 6200 780 0 ex-mine 05-04
Liulin Low-sulphur 900 0 ex-mine 05-04
Gujiao Low-sulphur 1770 -50 FOR 05-04
Xingtai Low-sulphur 2360 0 ex-Factory 05-04
Yangquan PCI 1280 -30 FOR 05-04
Index RMB/t WoW WoW% Date
Qinhuangdao 507.0 1.0 0.20 05-04
Caofeidian 541.0 9.0 1.69 05-04
Huanghua 216.9 12.4 6.06 05-04
Guangzhou 291.2 3.0 1.04 04-27
coastal 6PPs 1629.8 44.7 2.82 07-02
North Ports 2697.8 53.0 2.00 02-01
Yangtze River delta 1242.5 -74.7 -5.67 02-01
South Ports 2233.4 -216.0 -8.82 02-01
中国煤炭市场��?