Shandong planed to close four coal mines in 2019

Time:2019-04-17 10:10:34      Source: cctdcoal.com
Shandong Provincial Energy Bureau announced the target mission of coal de-capacity in 2019 and the list of shutting-down coal mines recently, the province planed to close four coal mines this year, with a withdrawal capacity of 1.62 million tons. Detailed coal mines are as follows:
Item Mine name Capacity scale(million tons/year) Adress
1 Shandong Wusuotun Shengjian Coal Mine 0.39 Tengzhou City
2 Shandong Shengquan Mining Co., Ltd. 0.45 Xintai City
2 Shandong Fengyuanyuanhang Coal Industry Co., Ltd. Zhaopo Coal Mine 0.3 Tengzhou City
4 Shandong Weishanhu Mining Group Co., Ltd. Sihe Coal Mine 0.48 Weishan County
Index RMB/t DoD Basis Date
Datong 5500 700 0 ex-mine 05-04
Shuozhou 5200 680 0 FOR 05-04
Ordos 5500 700 0 ex-mine 05-04
Yulin 6200 780 0 ex-mine 05-04
Liulin Low-sulphur 900 0 ex-mine 05-04
Gujiao Low-sulphur 1770 -50 FOR 05-04
Xingtai Low-sulphur 2360 0 ex-Factory 05-04
Yangquan PCI 1280 -30 FOR 05-04
Index RMB/t WoW WoW% Date
Qinhuangdao 507.0 1.0 0.20 05-04
Caofeidian 541.0 9.0 1.69 05-04
Huanghua 216.9 12.4 6.06 05-04
Guangzhou 291.2 3.0 1.04 04-27
coastal 6PPs 1629.8 44.7 2.82 07-02
North Ports 2697.8 53.0 2.00 02-01
Yangtze River delta 1242.5 -74.7 -5.67 02-01
South Ports 2233.4 -216.0 -8.82 02-01
中国煤炭市场��?