Shandong planed to close four coal mines in 2019

Time:2019-04-17 10:10:34      Source: cctdcoal.com
Shandong Provincial Energy Bureau announced the target mission of coal de-capacity in 2019 and the list of shutting-down coal mines recently, the province planed to close four coal mines this year, with a withdrawal capacity of 1.62 million tons. Detailed coal mines are as follows:
Item Mine name Capacity scale(million tons/year) Adress
1 Shandong Wusuotun Shengjian Coal Mine 0.39 Tengzhou City
2 Shandong Shengquan Mining Co., Ltd. 0.45 Xintai City
2 Shandong Fengyuanyuanhang Coal Industry Co., Ltd. Zhaopo Coal Mine 0.3 Tengzhou City
4 Shandong Weishanhu Mining Group Co., Ltd. Sihe Coal Mine 0.48 Weishan County
Index RMB/t DoD Basis Date
Datong 5500 ex-mine 07-01
Shuozhou 5200 FOR 07-01
Ordos 5500 ex-mine 07-01
Yulin 6200 ex-mine 07-01
Liulin Low-sulphur ex-mine 07-01
Gujiao Low-sulphur FOR 07-01
Xingtai Low-sulphur ex-Factory 07-01
Yangquan PCI FOR 07-01
Index RMB/t WoW WoW% Date
中国煤炭市场��?