Two coal mine projects in Shaanxi and Shanxi was approved

Time:2019-04-12 11:33:50      Source: cctdcoal.com
Accord to National Development and Reform Commission, two coal mine projects including the Balasu Coal Mine in the North District of Shaanxi Hengheng Mining Area and the Pang Panta Coal Mine in the Liliu Mining Area in Shanxi Province were approved. These two coal mine projects are all coal production capacity replacement projects with a total capacity of 20 million tons/year.
 
The construction site of the Balasu Coal Mine in the North District of Shaanxi Hengheng Mining Area is located in Yuyang District, Yulin City, Shaanxi Province. The total investment is 11.412 billion yuan (excluding mining rights fees). The construction of the Balasu Coal Mine is 10 million tons/year, including the the construction of a coal preparation plant of the same scale.
 
The construction site of Pang Panta Coal Mine in Liliu Mining Area of Shanxi Province is located in Lin County, Lvliang City, Shanxi Province. The project unit is Huozhou Coal Electricity Group Lvlin Energy Chemical Co., Ltd., with a total investment of 6.261 billion yuan (excluding mining rights fees).The scale of mine construction is 10 million tons/year, including the construction of a coal preparation plant of the same scale.
Index RMB/t DoD Basis Date
Datong 5500 455 0 ex-mine 07-01
Shuozhou 5200 445 0 FOR 07-01
Ordos 5500 420 0 ex-mine 07-01
Yulin 6200 540 0 ex-mine 07-01
Liulin Low-sulphur 565 0 ex-mine 07-01
Gujiao Low-sulphur 1095 0 FOR 07-01
Xingtai Low-sulphur 1210 0 ex-Factory 07-01
Yangquan PCI 795 0 FOR 07-01
Index RMB/t WoW WoW% Date
中国煤炭市场��?