NDRC has agreed to approve changes at four coal mines in Shaanxi Province

Time:2019-02-14 13:52:40      Source: cctdcoal.com

According to National Development and Reform Commission (NDRC), in order to speed up the release of high-quality production capacity and optimize the structure of the coal industry, the National Development and Reform Commission issued a series of documents on February 13th to approve the changes in the approved contents of the Caojiatan Coal Mine Project, Xiaozhuang Coal Mine Project, Xiaobaodang No. 1 Coal Mine Project and Xiaobaodang No. 2 Coal Mine Project in Shaanxi Province. The total capacity after the change of the four coal mine projects was 49 million tons/year.It is reported that the four coal mine projects belong to the Shaanxi Coal and Chemical Industry Group.
 
In response to the reply, the projects should announce the registration of coal mine production capacity according to the construction scale. And it is not allowed to approve small coal projects to build large coal projects and with super-capacity production.
Index RMB/t DoD Basis Date
Datong 5500 450 0 ex-mine 06-13
Shuozhou 5200 435 0 FOR 06-13
Ordos 5500 415 0 ex-mine 06-13
Yulin 6200 535 0 ex-mine 06-13
Liulin Low-sulphur 570 0 ex-mine 06-13
Gujiao Low-sulphur 1095 0 FOR 06-13
Xingtai Low-sulphur 1210 0 ex-Factory 06-13
Yangquan PCI 770 0 FOR 06-13
Index RMB/t WoW WoW% Date
Qinhuangdao 620.0 -38.0 -5.78 06-12
Caofeidian 528.0 -39.0 -6.88 06-12
Huanghua 178.3 -12.0 -6.31 06-12
Guangzhou 290.0 13.0 4.69 06-12
coastal 6PPs 1629.8 44.7 2.82 07-02
North Ports 2697.8 53.0 2.00 02-01
Yangtze River delta 1242.5 -74.7 -5.67 02-01
South Ports 2233.4 -216.0 -8.82 02-01
中国煤炭市场��?