According to Shanxi Energy Administration, Shanxi Province has approved the joint commissioning of six large mines since November. Details are as follows:
1. Lulin Energy Chemical Co., Ltd. of Huozhou Coal Electicity Group: the joint trial operation of the merger, reorganization and integration project of Pangpangta Coal Mine with 3 million tons/year was postponed until December 31, 2018.
2. Datong Coal Industry Co., Ltd. of Shanxi Coal Transportation and Sales Group: the joint trial operation of the merger, reorganization and integration project of the coal mine with 1.2 million tons / year began on November 30, 2018. The trial operation period is 1 to 6 months, and it should be finished before May 30, 2019.
3. Zhengxin Coal Coke Co., Ltd. of Shanxi Fenxi Mining Group: the joint trial operation of the merger, reorganization and integration project of Heshan Coal Mine with 1.8 million tons/year (initialstage: 600 thousand tons/year) began on November 21, 2018. The trial operation period is 1 to 6 months, and it should be finished before May 21, 2019.
4. Shanxi Lu'an Mining (Group) Co., Ltd.: Gucheng Mine and the supporting coal preparation plant project can start joint trial operation on November 21, 2018. The trial operation period is 1 to 6 months, and it should be finished before May 21, 2019.
5. Shanxi Ningwu Yushupo Coal Industry Co., Ltd.: the joint trial operation of the merger, reorganization and integration project of the coal mine with 1.2 million tons / year began on November 13, 2018. The trial operation period is 1 to 6 months and it should be finished before May 13, 2019.
6. Shanxi Gaoping Kexing Shenjiazhuang Coal Industry Co., Ltd.: the joint trial operation of the merger, reorganization and integration project of the coal mine with 1.2 million tons / year was postponed for three months until February 13, 2019.
Index | RMB/t | DoD | Basis | Date |
---|---|---|---|---|
Datong 5500 | 455 | 0 | ex-mine | 07-01 |
Shuozhou 5200 | 445 | 0 | FOR | 07-01 |
Ordos 5500 | 420 | 0 | ex-mine | 07-01 |
Yulin 6200 | 540 | 0 | ex-mine | 07-01 |
Liulin Low-sulphur | 565 | 0 | ex-mine | 07-01 |
Gujiao Low-sulphur | 1095 | 0 | FOR | 07-01 |
Xingtai Low-sulphur | 1210 | 0 | ex-Factory | 07-01 |
Yangquan PCI | 795 | 0 | FOR | 07-01 |
Index | RMB/t | WoW | WoW% | Date |
---|---|---|---|---|