Guizhou has closed 81 coal mines and cut 12.66 million tons of capacity in 2019

Time:2019-12-11 11:00:51      Source:CCTDCOAL
Guizhou province plans to close 80 coal mines with a capacity of 10 million tons per year in 2019, according to a statement signed with the state on the responsibility for reducing overcapacity in the coal industry.
 
After the acceptance checks, 81 coal mines with capacity of 12.66 million tons per year meet the national coal industry's acceptance standard for cutting capacity.
 
By 2020, Guizhou shall form a modern and new coal industry system with all the coal mines in the province at or above 300,000 tons per year, which shall basically realize mechanized mining, fully realizing intelligent control, steadily guaranteeing the supply of thermal coal and other coal needs, and meet the intensive, safe, efficient and green requirements.

Index RMB/t DoD Basis Date
Datong 5500 700 0 ex-mine 05-04
Shuozhou 5200 680 0 FOR 05-04
Ordos 5500 700 0 ex-mine 05-04
Yulin 6200 780 0 ex-mine 05-04
Liulin Low-sulphur 900 0 ex-mine 05-04
Gujiao Low-sulphur 1770 -50 FOR 05-04
Xingtai Low-sulphur 2360 0 ex-Factory 05-04
Yangquan PCI 1280 -30 FOR 05-04
Index RMB/t WoW WoW% Date
Qinhuangdao 507.0 1.0 0.20 05-04
Caofeidian 541.0 9.0 1.69 05-04
Huanghua 216.9 12.4 6.06 05-04
Guangzhou 291.2 3.0 1.04 04-27
coastal 6PPs 1629.8 44.7 2.82 07-02
North Ports 2697.8 53.0 2.00 02-01
Yangtze River delta 1242.5 -74.7 -5.67 02-01
South Ports 2233.4 -216.0 -8.82 02-01
中国煤炭市场��?